How it was built

From RFP requirements to live Turanto application model.

This page explains the three-step build story for the demo asset without distracting from ESVBA’s operational outcomes.

Step 1

Translate RFP needs into an operating model

The RFP requirements were mapped into finance, customer, inventory, provisioning, jobs/grants, regulatory, and governance capabilities.

Step 2

Generate the ShoreBridgeV42 application model

Turanto metadata defined entities, attributes, associations, roles, rules, menus, and branding for the broadband authority ERP domain.

Step 3

Publish a live demo entry point

This public-facing site frames the live Turanto demo, explains the capabilities, and provides a clean URL for Stage 11 proposal use.

Stage 10 handoff

URL to reference in Stage 11a and Stage 11b.

Marketing/demo site target: https://ShoreBridgeV42.turanto.com
Live app login URL: https://dev.turanto.com/AppPreviewerV1?previewId=ShoreBridgeV42

Open Live App